
Greenery Applications
— Flexible, Acoustic, and Maintenance-Free
Seamless Moss Wall for refined architectural interiors.
Flex Moss Wall for adaptive surface and curved walls.
NRC-rated acoustic moss frames for ceilings, planters, and space dividers.
Certified Preserved Greenery System
— Built for Commercial Interiors

Fire-rated: ASTM E84 Class A
Surface burning characteristics tested on backing assembly

Low VOC: CDPH v1.2 Compliant
Meets LEED v4 and WELL indoor air quality standards

NRC 1.0+ Acoustic Absorption
Reduces noise in offices and wellness environments

Contributes to LEED v4.1 Credits
EQ Low-Emitting Materials · Acoustic Performance · Innovation

UV Stability Tested
Supports long-term visual stability across all moss types

Microbial Resistant
Inhibits microbial growth on the panel surface

Zero Maintenance
Maintenance-free in normal indoor conditions

10+ Year Indoor Lifespan
With manufacturer warranty per project specification

Spec-Ready, Architect-Supported
Specify preserved greenery with confidence—from early design through CDs and submittals. Wildleaf provides project-specific drawings, performance documentation, and design support to help streamline specification and coordination.
Includes:
-
2D / 3D design files
-
Custom layouts & shop drawings
-
Specifications, test reports & compliance documentation
-
Design support from concept through CD & submittal
Trusted by Commercial Design Leaders Nationwide
We collaborate with:
-
Architects
-
Interior Designers
-
General Contractors
-
Developers
-
Property Managers
Across sectors, including:
-
Offices
-
Retail
-
Healthcare
-
Hospitality
-
Senior Living
-
Education
Whether the priority is fire performance, acoustic comfort, indoor air quality or zero-maintenance greenery, Wildleaf delivers preserved greenery systems that raise the standard of indoor greenery for commercial spaces.

Lasted from Wildleaf
Sep 10, 2026
ASTM E84 Class A Moss Wall Systems: Test Results & Report Numbers
Jul 06, 2026
MIT Martin Trust Center Moss Wall Case Study: Preserved Moss Wall Installation for an Active Innovation Hub
May 25, 2026




























